40m Tower and Beam refurb starts

The clubs 40m Tower and beam, long overdue, service is under way. The tower has been stripped, cleaned and sprayed. Currently waiting on new pulley wheels to arrive so that re-assembly can take place. The tower will receive new wires, new pulleys, new winch and a re-paint.

The 40m beam will not be missed out. After a clean it will receive a new design upgrade, removing the loading coils and capacity hat and replacing with a large T section turning the beam into a Moxon beam, which should improve overall efficiency.